
Copyright © 2015 Draper Inc. Form ScissorLiftSL_Inst15 Printed in U.S.A.
Caution:
IMPORTANT SAFETY INSTRUCTIONS
Read all instructions completely before proceeding.
DANGER: To reduce risk of shock:
Always disconnect power from lift before cleaning.
WARNING–To reduce risk of burns, fires, electric shock or injuries to persons:
Disconnect power from lift before putting on or taking off parts.
Use this lift only for its intended use as described in these instructions. Do
not use attachments not recommended by the manufacturer.
Never operate this lift if it has a damaged cord or plug. If it is not working
properly, call your dealer or the manufacturer for assistance/repair.
Keep cords away from heated surfaces.
Never operate lift with air opening blocked. Keep the air openings free of lint,
hair, and the like.
Never drop or insert any object into any opening.
Do not use outdoors.
Route cords and cables as shown in the instructions.
WARNING: Risk of Electric Shock—connect this product to a
properly grounded electrical supply.
IMPORTANT INSTALLATION/OPERATING INSTRUCTIONS
WARNING: To prevent injury, this apparatus must be securely attached to the
building structure in accordance with the instructions.
Caution: Do not operate Scissor Lift SL without a minimum of 15 lbs. of weight
attached to the pan. Operating without weight may cause cables to unspool.
Test lift prior to installation. Please Note: Packaging must be removed from
lift before testing.
Follow instructions carefully. Installation contrary to instructions invalidates
warranty.
Do not obstruct operation of Scissor Lift SL with fingers or any object.
Serious injury or damage could result.
Lift is intended for use with product weighing not more than 100 pounds.
Scissor Lift SL is designed to accommodate ceiling suspended equipment.
Equipment should not be allowed to rest on optional ceiling closure
during operation (refer to section titled “Installing Projector”).
Entire bottom of unit must be unobstructed to permit proper operation.
Sufficient clearance must be allowed below projector or optional ceiling
closure: 4' for Model SL4, 10' for Model SL10, etc.
Unit must be installed level (use a carpenter’s level).
Unit operates on 115V AC 60 Hz. current. 9.06 amps current draw (2.06
amps for lift, 7 amps for outlet).
Verify the show position when testing lift. Make required changes by referring
to adjustment instructions on page 4 of this document.
The maintenance/service factory limit setting must not be adjusted to a lower
position than the preset factory limit setting. In addition, Draper does not
recommend setting show position at the maintenance/service position—for
example, if you wish to have 8' show position, order a lift with at least a 10'
maintenance position.
When the Scissor Lift SL is to be installed in “other space used for
environmental air” the optional environmental air space housing must
be installed per instructions to isolate the lift from the “other space
used for environmental air.”
When Scissor Lift SL is NOT installed in environmental air space housing
and optional ceiling closure, the ALTERNATE wiring for up limit switch may
be used (see Alternate Wiring schematic on page 5).
CAUTION: Before servicing unit, disconnect hardwired control and
any remote control.
Note: Unit has been thoroughly inspected and tested at factory and found
to be operating properly prior to shipment.
Planning
Based on screen location and projector specifications, determine proper
position for projector installation.
Confirm that there is adequate space for installation and operation. Minimum
clearance above ceiling level varies according to Scissor Lift model, plus height
of projector, optional mounting bracket, optional ceiling closure, and optional
Environmental Air Space Housing.
Arrange to provide service access to the unit.
Maximum lifting capacity is 100 lbs.
As Soon As Scissor Lift Arrives
Open carton and inspect for damage.
Locate the following parts:
A. The unit itself
B. Controls
C. Optional equipment: Environmental Air Space
Housing, Universal Projector Mount, closure panel or ceiling finish kit
(all ship in separate cartons).
Test lift prior to installation. Please Note: Packaging must be removed from
lift before testing.
Important Safety/Installation/Operating Instructions
Scissor Lift SL Video Projector Lift by Draper
Save These Instructions
Electrical Connections
Unit operates on 115V AC, 60 Hz. current. 9.06 amps current draw (2.06 amps
for lift, 7 amps for outlet). Opening the electrical box exposes terminals for field
connections. Unit is shipped with internal wiring complete.Wire to connect unit to
power supply should be furnished by installer. Connections should be made in
accordance with wiring diagram, and wiring should comply with national and local
electrical codes. An appropriate disconnect device shall be provided as part of the
building installation. All operating switches
should be “off” before power is connected.
If you encounter any difficulties installing or servicing your Scissor Lift SL, call your
dealer or Draper, Inc. in Spiceland, Indiana, 765-987-7999, or fax 765-987-7142.
Operation
Before operating or testing the unit, make sure the
packaging has been removed from the unit. Remove the
corrugated block from the cardboard sleeve (bottom-most
packaging material), then collapse the sleeve and remove it,
along with the rest of the packaging. Next, operate the lift in
the "up" direction, so the lift's control encoder will recognize
it's "home" location. Until you do this, the Down function will
not work. You must also do this if the Scissor Lift ever
loses or is disconnected from the power.
When unit is first operated, be cautious! If unit fails
to operate properly, press “off” and recheck electrical
connections before proceeding. Cycle unit down and up
several times to confirm satisfactory operation.
Caution: Do not pull on or touch safety belt when unit
is in motion. If belt locks, the cables will unspool.
Caution: Obstructing bottom pan may cause cables
to unspool.
Caution: Do not operate Scissor Lift SL without a
minimum of 15 lbs. of weight attached to the pan.
Operating without weight may cause cables to unspool.
Standard Single Station Low Voltage Control (See Fig. 1)—One three-button
switch with “up”, “down”, and “off” buttons. Lift starts up or down when appropriate
button is pressed, and may be stopped by pressing “off” button. Factory set
limit switches stop lift automatically when projector is in “show” position. One
momentary key switch lowers lift from “show” to “service” position.
Optional Multiple Station Control—Optional, moves lift from “stored” to “show”
position only. Each switching station has a three-button switch with “up”, “down”,
and “off” buttons. Lift starts up or down when appropriate button is pressed,
and may be stopped by pressing “off” button. Factory set limit switches stop lift
automatically when projector is in “show” position.
Optional Key Operated Switch—If ordered, the standard LVC-S can be replaced
with a second single station, momentary key-operated three position (up/off/down)
switch. Multiple Station Control required for this option. Moves lift from “stored” to
“show” position only.
Optional Infrared or Radio Frequency Remote Control—If ordered, a three-
button transmitter is provided, with “up”, “down”, and “stop” buttons. Unit starts up
or down when appropriate button is pressed, and may be stopped by pressing
“off” button. Factory set limit switches stop unit automatically when projector is in
“show” position. Only controls "show" and "stored" positions.
Optional RS232 Control—For Serial communication an R2D7 Serial
Communications Interface is optionally available.
Low Voltage Trigger—Input provided for Low Voltage Trigger from projector (see
diagram on page 4).
Please Note: Scissor Lift SL must be installed in accordance with the requirements
of the Local Building Codes, the Canadian Electrical Code (CEC), CAN/CSA
C22.1 and the National Electric Code (NEC), NFPA 70, as required. An appropriate
disconnect device shall be provided as part of the building installation.
D C U
2¾"
4½"
7
/8"
Front Side Back
LVC-S
Up & Show
UP
OFF
DOWN
UP
DOWN
OFF
SP-KSM
Service
Figure 1
Caution:
Beware
of pinch
points
U.S. Patent
Number
D395,909
WARNING/AVERTISSEMENT
RISK OF ELECTRIC SHOCK. DO NOT OPEN
RISQUE DE CHOC ELECTRIQUE. NE PAS OUVRIR.
Caution: Make sure electrical supply has been disconnected before
attempting to connect Scissor Lift to electricity.
Scissor Lift should be operated and checked prior to installing projector and/or
optional ceiling closure. Low Voltage Control Switch shown below comes with 75'
of non-plenum rated cable and should be plugged in to Control Panel on top frame
of lift for control of the "Up" and "Show" positions. Momentary Key Switch shown
below comes with 75' of cable and should be plugged in to Control Panel on top
frame of lift for control of the "Service" position.
Scissor Lift SL is approved to UL 2442 and CSA C22.2 No. 60065-03.
Komentáře k této Příručce